Skip to content
Hubstone
← All professionals

The House Remembers Who Sold It.

Start the home’s record at listing, while the seller still remembers the details. At closing, hand the buyer the record with one link. The pages you share and the home record you print carry your name and brokerage, on the resource they return to as they care for the house.

A port-wine linen Home Binder embossed for Alder & Vale Realty, with its utilities page, a water heater record and the contents page fanned out behind it
The sample binder, with a few of its printed pages. Yours shows your name and brokerage.
11

Sellers now stay in their homes a median of 11 years, the longest on record. That is eleven years for a family to forget their agent, and eleven years of paperwork for the house to lose.

Source: National Association of Realtors, 2025 Profile of Home Buyers and Sellers.

From Your Listing to Their Next One.

Select each stage to see what the record holds and who adds to it.

Listing-ready before the photos

Walk the house with your seller while they still remember: where the shutoffs are, what paint is on the walls, how old the roof is and who fixed the sprinklers. Each answer goes on the room or system it describes.

  • Main water shutoffGarage, left wall, quarter turn
  • Water heater2019, serviced in March
  • Living room paintBenjamin Moore Pale Oak, eggshell
  • Sprinklers6 zones, controller in the garage

A sample client handoff

The Home, on Paper and in the App.

Give your client the shutoffs, systems, appliances, finishes and contacts for their home, beautifully organized in a binder with your name on it.

Leave clear instructions for the next person looking after the place.

Explore the prepared client pages below. The free download is the blank Home Binder template.

Cameo Road property record

See what you get.

Cameo RoadEvery section, free to explore
Page 1 of 41

Make This Sample Your Own.

Type your brokerage name and it appears on the cover and on every page. Choose the items that stay with the house, then print the sample or save it as a PDF.

Make this sample your own

Your name appears on the cover, every interior page and the PDF. Changes apply to this sample while the page is open.

Choose the items included in the handoff

Include only items staying with the home. Private notes, prices and household contents are excluded.

Alder & Vale Realty

HOME BINDER

Cameo Road

Client reference
Cover

41 interior pages, plus the cover. Preview and print use the same selected records. Review all pages before handing over a client copy.

Cover
Alder & Vale Realty

HOME BINDER

Cameo Road

Client reference

Stay Useful, Not Just Visible.

A monthly email with your logo

  • Easy to ignore, and easy to unsubscribe from
  • Generic tips for any house
  • Stops meaning anything after the first year

The home’s record you started

  • Opened whenever something in the house needs attention
  • Specific to this house: its models, its paint, its shutoffs
  • More valuable every year, and ready to list when they sell

What It Leaves Alone.

Keep your MLS, CRM and transaction tools in place. Hubstone organizes the practical information about the home that a buyer may need after closing. It does not replace disclosures, inspections or the documents governing the transaction, and it makes no claim about condition that the documents do not establish.

The Listing Record, Line by Line.

A listing record starts with what a seller and their agent can read off the house before it is listed. This is what a finished one holds.

  1. Start the listing’s record with the seller.
  2. Send the buyer preview.
  3. Send the closing transfer when the sale closes.
62 lines across 8 records and 2 pages.
Heating and cooling8 lines

Starts as: Handoff template: read the label on the equipment and fill in the brand, model, and install date.

  1. A photo of the rating labelBrand, model and serial are read from the label, never from memory. The photo settles any later question.
  2. Exactly where it isIndoor unit, outdoor unit and thermostat each get their place. A technician should walk straight to all three.
  3. Filter size and where the filter slides inThe single most asked question about a heating and cooling system. Write the size printed on the frame.
  4. Fuel, and where its shutoff or breaker isGas valve or breaker number, so the system can be made safe before anyone arrives.
  5. How the thermostat is set, under "For residents"The people living there read how to use it, in plain words.
  6. The install date, and who installed itAge decides most repair-or-replace conversations, and the installer is the first call under warranty.
  7. Service visits, with the invoiceEach visit is added to the same record, so the next technician reads what the last one did.
  8. Warranty paperwork and the registrationAttached to the record as a document, so it is found by opening the thing it covers.
Water heater8 lines

Starts as: Handoff template: read the label on the equipment and fill in the brand, model, and install date.

  1. A photo of the rating labelBrand, model and serial are read from the label, never from memory. The photo settles any later question.
  2. Exactly where it isRoom and corner. Include the drain pan and how much room there is to work.
  3. Fuel and capacity, from the labelElectric or gas and the tank size decide what can replace it.
  4. The breaker or gas valve, and the cold water shutoffWhat to turn off first if it leaks.
  5. Temperature setting as leftRecorded once so a change is noticed.
  6. The install date, and who installed itAge decides most repair-or-replace conversations, and the installer is the first call under warranty.
  7. Flush, anode and relief valve checksLogged when a professional does them. Left blank until then.
  8. Warranty paperwork and the registrationAttached to the record as a document, so it is found by opening the thing it covers.

Filled in, on Cameo Road: water heater

Where
First floor, laundry
Make and model
Rheem XE50T06ST45U1
Size
50 US gal, tall electric tank
Installed
2015
Breaker
24 / 26
Connections
Electric tank; breaker 24 / 26 in the existing home record. Verify the rating plate before electrical work.
Before replacing
Published model dimensions. Measure the installed tank, drain pan and service access before replacement.
To check
Log professional tank, anode, relief-valve and electrical inspections. Record leaks or changes in hot-water performance.
Roof6 lines

Starts as: Handoff template: note the roofing material, the year it went on and any transferable warranty.

  1. Material, and the product if knownShingle, metal, tile or membrane, with the maker and color when the paperwork names them.
  2. The year it went on, and who did itFrom the invoice or the permit. Left as unknown rather than guessed.
  3. Warranty, and whether it transfersThe document itself, attached.
  4. Photos of each slope, datedA baseline to hold the next photo against.
  5. Penetrations, flashing and guttersWhere the vents, skylights and chimneys are, since that is where roofs are repaired.
  6. Repairs, with the invoiceEach one added to the same record.
Electrical panel7 lines

Starts as: Handoff template: note the panel make, the amperage and where it is.

  1. Maker and rating, from the labelRead from the accessible label. An electrician confirms anything behind the cover.
  2. Exactly where it isWall and room, with a photo of the closed panel in its setting.
  3. The main disconnectIts confirmed location and a photo of the labeled handle.
  4. A dated circuit directoryAttached as a document. A directory with no date is treated as unconfirmed.
  5. The breakers that matterWater heater, range, heating and cooling, and anything on the exterior.
  6. Other power sourcesSolar, battery or generator, with their disconnects, or a plain "none".
  7. The electrician and the last visitName, date and invoice.
Range / oven7 lines

Starts as: Handoff template: read the label on the equipment and fill in the brand, model, and install date.

  1. A photo of the rating labelBrand, model and serial are read from the label, never from memory. The photo settles any later question.
  2. Fuel and connectionGas, electric or dual fuel, with the circuit or the gas shutoff location.
  3. The opening it sits inWidth, counter height and what is behind it, measured at the house.
  4. Anti-tip bracket confirmedA yes from the installer, with the date.
  5. The install date, and who installed itAge decides most repair-or-replace conversations, and the installer is the first call under warranty.
  6. The manual for this exact modelLinked or attached once. Nobody searches a drawer or guesses from a similar model.
  7. Warranty paperwork and the registrationAttached to the record as a document, so it is found by opening the thing it covers.

Filled in, on Cameo Road: range & oven

Where
Kitchen, cooking wall
Make and model
GE JB735SPSS
Size
30 in class, freestanding electric range
Connections
Electric cooking appliance. Have the installer record the actual circuit, receptacle and cord configuration.
Before replacing
Record counter height, opening width, rear connections and oven-door clearance. Have the anti-tip installation checked by the installer.
To check
Inspect the cooktop, oven-door seal and racks. Keep the installation instructions with the anti-tip record.
Refrigerator7 lines

Starts as: Handoff template: read the label on the equipment and fill in the brand, model, and install date.

  1. A photo of the rating labelBrand, model and serial are read from the label, never from memory. The photo settles any later question.
  2. Water line and its shutoffWhere the ice maker line starts and how to close it.
  3. Water filter part referenceThe filter this model takes, so a replacement is one search.
  4. The opening and the delivery pathCabinet opening, door swing and the narrowest doorway on the way in.
  5. The install date, and who installed itAge decides most repair-or-replace conversations, and the installer is the first call under warranty.
  6. The manual for this exact modelLinked or attached once. Nobody searches a drawer or guesses from a similar model.
  7. Warranty paperwork and the registrationAttached to the record as a document, so it is found by opening the thing it covers.

Filled in, on Cameo Road: refrigerator

Where
First floor, kitchen
Make and model
GE GNE27JYMFS
Size
27.0 cu ft, French-door refrigerator
Connections
Record the outlet, breaker and ice-maker water shutoff. Confirm actual water-line routing at the home.
Before replacing
Measure the cabinet opening, hinges, handles, door swing and delivery path. Overall size is not the required installation opening.
To check
Check door seals and the visible water connection. Record filter changes and temperature concerns as they occur.
Dishwasher7 lines

Starts as: Handoff template: read the label on the equipment and fill in the brand, model, and install date.

  1. A photo of the rating labelBrand, model and serial are read from the label, never from memory. The photo settles any later question.
  2. Water shutoff, drain and powerUsually under the sink. A photo shows which valve.
  3. The full number from the door labelSome makers need the whole string, suffix included, to order a part.
  4. Filter cleaning, in one lineWhere the filter is and how often this household cleans it.
  5. The install date, and who installed itAge decides most repair-or-replace conversations, and the installer is the first call under warranty.
  6. The manual for this exact modelLinked or attached once. Nobody searches a drawer or guesses from a similar model.
  7. Warranty paperwork and the registrationAttached to the record as a document, so it is found by opening the thing it covers.

Filled in, on Cameo Road: dishwasher

Where
Kitchen, beside the sink
Make and model
Bosch SHPM65Z55N
Size
24 in class, built-in dishwasher
Connections
Record water shutoff, drain connection and electrical disconnect. Have installation details confirmed by the installer.
Before replacing
Confirm finished-floor height, cabinet opening, drain routing and door clearance before removal or replacement.
To check
Record filter cleaning, rinse-aid refills and any visible water near the base or supply connection.
Washer and dryer6 lines

Starts as: Handoff template: read the label on the equipment and fill in the brand, model, and install date. Say whether they stay with the house.

  1. A photo of the rating labelBrand, model and serial are read from the label, never from memory. The photo settles any later question.
  2. Supply valves, drain and the dryer vent routeOne photo each, so a leak or a clogged vent has a first step.
  3. Whether they stay with the houseAnswered before anyone asks at closing or at move-out.
  4. The install date, and who installed itAge decides most repair-or-replace conversations, and the installer is the first call under warranty.
  5. The manual for this exact modelLinked or attached once. Nobody searches a drawer or guesses from a similar model.
  6. Warranty paperwork and the registrationAttached to the record as a document, so it is found by opening the thing it covers.

What leaves your hands

The buyer preview

A view for buyers while the home is listed.

What a buyer reads
The record for the house with its documents. Access codes, private notes and anything marked private to you are left out.
It ends on its own
Open for 90 days, and you can close it sooner.

The closing transfer

One link, sent when the work is done. The owner reviews what is coming and accepts it into their own Hubstone.

Every record for the house
With its place, its photos and its details.
The documents attached to each record
Copied with the record they explain.
Nothing marked private to you
Trade sources and your own notes stay in your account.
Unfinished records are counted first
Your workspace shows how many records for the house are still waiting to be filled in.

Anything not yet known is left blank and shown as not recorded. A record never guesses a model, a date or a warranty.

What You Get, and What Your Client Gets

You get
A record for each listing, a buyer preview you can share under your name, and a transfer link for closing day.
Your client gets
The home’s record in a browser, with nothing to install: shutoffs, systems, appliances, finishes and contacts, theirs to keep and add to.
Handoff
At closing you send one transfer link. The buyer reviews what is coming and accepts it into their own Hubstone.
Cost
Pricing for professionals is set with each firm during the pilot, and nothing is charged without your agreement first. A record you hand to a client is free for them to receive.

Questions Realtors Ask

What does my client get?

The home’s record, theirs to keep, with the seller’s knowledge written down before it walks out the door, and a printed home record if you choose to print one.

Do I keep access after closing?

Not to the buyer’s record. Once they accept it, it is their own and you cannot see what they add, unless they choose to share it with you.

What if the seller won’t fill anything in?

The record still starts with the address, the inspection and the appliances you photograph at the walkthrough. The seller’s answers are a bonus.

Does it help with disclosures?

It gives the seller an organized list of systems, ages and repairs to work from. Disclosure forms and rules differ by state, so the forms themselves stay with you and your broker.

What does the buyer need to use it?

Shared records open in a browser on a phone or computer. A Hubstone account is needed to accept the record and manage it as their own.

Can it carry my brand?

Yes. Your name, color, contact line and logo sit at the top of the record pages you share and of the printed home record. Hubstone appears only as a small footnote.

What does it cost?

Pricing for professionals is set with each firm during the pilot, and nothing is charged without your agreement first. A record you hand to a client is free for them to receive.

Hand Over More Than the Keys.

Start your next listing’s record this week. We will help you set up the first one.

A request does not start a subscription or charge your client.